Key Projects
Shanxi Jinfeng Coal Chemical Co., Ltd. Fixed Bed Gasification Indirect Cooling Retrofit Project
Jincheng, Shanxi

Equipment: 4 sets of 60,000 Nm³/h coal gas dust removal and indirect cooling systems

Treated clean gas: dust content ≤10 mg/Nm³, temperature ≤40°C

Dust separation: pneumatically conveyed to plant ash silo

Condensate Treatment: Ammonia nitrogen content ≤100 mg/L after steam stripping;Recovered dilute ammonia water recycled back to the plant for reuse

Related cases
Related cases
010-6252 0420