Key Projects
Jiangsu Heyou Environmental Protection and Energy-saving Retrofit Project for Fixed-bed Clean Coal Gasification
Suqian , Jiangsu

Production Scale:150,000 tonnes/year synthetic ammonia

Equipment: 1 set of 50,000 Nm³/h coal gas dust removal and dry cooling purification system

Treated clean gas: dust content ≤20 mg/Nm³, temperature ≤40°C

Dust separation: pneumatically conveyed to plant ash silo

Achieved "zero discharge" of high-concentration wastewater, exhaust gas, and solid waste

Related cases
Related cases
010-6252 0420